MTD 683 Manual do Operador Página 9

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 8
9Section 4 — ASSembly & inStAllAtion
6. Install the bags onto the mounting frame as shown in
Figure 4-5. Simply place the leading edge of the bag onto
the front frame rail, then rock the bag backwards and down
into place. Repeat for the second bag.
1
2
Figure 4-5
7. Remove the discharge chute, or mulch plug. Retain the
wing knobs for installation of the deck chute in Step 10.
8. Insert the chute tube through the grass-catcher hood, in
the opening provided. It is easiest to feed the end of the
tube into the opening with the chute tube flipped upside
down, then rotating right-side once inserted into the hood.
See Figure 4-6.
Figure 4-6
9. Mount the bagger chute tube to the deck of the tractor by
lowering the chute tube over the mounting bolts in the
mowing deck, as shown in Figure 4-7.
10. Secure the rear mounting bolt with a wing knob (1), then
the front mounting bolt with another wing knob (2) as
shown in Figure 4-7.
1
2
Figure 4-7
Vista de página 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comentários a estes Manuais

Sem comentários